City of Sunrise, FL
Home MenuNob Hill Road Multi-Purpose Path Project
The City of Sunrise in partnership with the Broward Metropolitan Planning Organization (MPO) has a project planned along Nob Hill Road from Sunset Strip to NW 44th Street to provide a multi-purpose path. This project was identified and recommended in the City of Sunrise 2014 Bicycle & Pedestrian Greenways & Trails Master Plan and Bundle F of the Broward MPO’s Complete Streets Master Plan, with an objective to provide connectivity between existing bicycle corridors on Sunset Strip and NW 44th Street and allow local residents to travel to various City parks, schools, and shopping plazas by bicycle and foot.
The plan includes replacing the existing sidewalk along both sides of the corridor with a 10-foot-wide multi-purpose path that accommodates both pedestrians and bicyclists. The rendering above illustrates what the path may look like. The yellow line on the map at the bottom of the page shows its proposed location.
Additional scope items include, but are not limited to:
- installing detectable warning surfaces at all curb ramp locations,
- new striping with green lane markings and required signage,
- providing new crosswalk striping at intersections,
- reconfiguring existing curb ramps and turning lanes at road intersections, and
- providing new pedestrian lighting along the corridor.
In an effort to engage the community and receive feedback regarding this plan, the City of Sunrise will host a virtual presentation. Please join us online:
Nob Hill Road Multi-Purpose Path Project Virtual Presentation
Wednesday, October 14, 2020 / 6:00 p.m. to 7:00 p.m. (EDT)
Join the meeting from your computer, tablet or smartphone: https://global.gotomeeting.com/join/483255405
You can also dial in using your phone:
United States: +1 (872) 240-3212
Access Code: 483-255-405
Join from a video-conferencing room or system:
Dial in or type: 67.217.95.2 or inroomlink.goto.com
Meeting ID: 483 255 405
New to GoToMeeting? Get the app now and be ready when the meeting starts: https://global.gotomeeting.com/install/483255405
In addition, the presentation will be recorded and shared on this webpage on October 15th. Written comments may be sent to [email address] or [physical address] by [date].
For more information about the meeting or the Nob Hill Road Multi-Purpose Path project, please contact [contact info].